Irish Rail hofft, noch vor 2030 mit dem Bau des Western Rail Corridor beginnen zu können
https://www.independent.ie/regionals/mayo/news/irish-rail-hopes-to-have-western-rail-corridor-construction-underway-before-2030/a1540391420.html
Von Traditional-Skill540
15 Kommentare
Booo!!! people shouldn’t have nice things
„Hopes“ doing a lot of the heavy lifting there I’d say
I’d love to see a cost benefit analysis on this.
It’s a nice idea but not worth the cost.
Much more necessary projects to do.
The key word is
>hopes
„looking ‘at the end of this decade’ for construction works to commence“ ffs lol
It will require significant overhaul and no doubt the building of new bridges and crossings but given the alignment is already there a 5 year lead time is a complete piss take.
That’s pretty ambitious considering this has not been officially proposed, nor is it part of current national policy (the NDP). Nice to see ambition from IR but I wouldn’t hold my breath
Lol
Yeah yeah
IÉ have basically zero power on their own. The NTA runs everything now
Do they only rebuild stuff. Is there anything new on the cards at all.
I will believe it when I see it. When I am 130 years old and get my second cataract lens replacement.
“Era we might have that shtarted in few years, we’ll let ye know, sound”
It’s a race to see what’ll finish first, this or the metro link
Let’s just get the Metro built before we lose the run of ourselves.