Share Facebook Twitter LinkedIn Pinterest Bluesky Threads Prag eröffnet seinen ersten neuen großen Bahnhof seit 40 Jahren! Die Kosten betrugen 230 m Euro. (Praha – Bubny) https://i.redd.it/5coj2wv5hmgf1.jpeg Von GPwat
GPwat on 02.08.2025 3:18 p.m. [Article with more pics](https://zdopravy.cz/praha-ma-po-40-letech-nove-nadrazi-sprava-zeleznic-dokoncila-obri-stavbu-v-bubnech-252966/)
gmaaz on 02.08.2025 3:27 p.m. Looking good, I like it. Except the clock, I would’ve painted it in black.
Vaxtez on 02.08.2025 3:52 p.m. That train station symbol reminds me of the British Rail/National Rail double arrows somewhat
Gamberetto__ on 02.08.2025 3:52 p.m. Bureaucrats really love this grey square deppresing style. Perhaps it’s a reflection of the soul of those who rule over us.
JoyOfUnderstanding on 02.08.2025 3:57 p.m. 230m euro? How come it’s so costly? In Poland Łódź Fabryczna cost was around 400m euro, and it’s absolutely massive. They build some new streets as well. https://cdn.galleries.smcloud.net/t/galleries/gf-NLVR-rX7y-339h_nowe-centrum-lodzi-z-najnowszymi-realizacjami-664×442.jpg https://uml.lodz.pl/files/public/_processed_/e/a/csm_RAJ20161211_43167_09c6b6c27a.jpg
L07h1r1el on 02.08.2025 4:05 p.m. Built with concrete blocks, costs 230M EUR It’s the same everywhere apparantly, wasting money on stuff that shouldn’t be this expensive
Prometheides on 02.08.2025 4:14 p.m. I wonder what happened 40 years ago that stopped infrastructure development 🤔
10 Kommentare
It looks like the USSR still exists?
[Article with more pics](https://zdopravy.cz/praha-ma-po-40-letech-nove-nadrazi-sprava-zeleznic-dokoncila-obri-stavbu-v-bubnech-252966/)
Looking good, I like it. Except the clock, I would’ve painted it in black.
Looks good but 230M euro?
Seems crazy expensive
r/trainstations
That train station symbol reminds me of the British Rail/National Rail double arrows somewhat
Bureaucrats really love this grey square deppresing style.
Perhaps it’s a reflection of the soul of those who rule over us.
230m euro? How come it’s so costly?
In Poland Łódź Fabryczna cost was around 400m euro, and it’s absolutely massive. They build some new streets as well.
https://cdn.galleries.smcloud.net/t/galleries/gf-NLVR-rX7y-339h_nowe-centrum-lodzi-z-najnowszymi-realizacjami-664×442.jpg
https://uml.lodz.pl/files/public/_processed_/e/a/csm_RAJ20161211_43167_09c6b6c27a.jpg
Built with concrete blocks, costs 230M EUR
It’s the same everywhere apparantly, wasting money on stuff that shouldn’t be this expensive
I wonder what happened 40 years ago that stopped infrastructure development 🤔