21 Kommentare
Will be hard if Ontario stops hydro export because of Trump stupidity
**1.4 GIGAWATTS?!?!?!?**
Funding already pulled https://www.axios.com/local/detroit/2025/12/18/saline-data-center-project-limbo
Reminder, Larry Ellison is going to use these data centers to push propaganda on new “American tik tok” and spy on you with partnerships at flock and palantir.
All because he was best friends with trump the child rapist lieing bitchboy.
Can we stop singing our own death please 🙂 thank you
I hate this timeline so much
Michigan can’t fix its clean water issues but can figure out data centers for capitalist games
wow so all I have to do is pay higher electric bills so billionaires can replace me? it really sounds like a great deal for me.
maybe we can give them a tax break for this service. It just wouldn’t be fair for the billionaires to have to pay for any part of it.
[1.21 GIGAWATTS?!?](https://youtu.be/mTyC0gRI2HY?si=z34jyI060RbBHTMn)
If only they had a Flux Capacitor…
Im not too fuzzed about this because OpenAI does not have the money and Oracle is burning cash like there`s no tomorrow at the moment. MSFT is not willing to finance it, and Softbank does not have the money.
Ban AI infrastructure statewide, is the approach politicians should be taking. Let the billionaires setup their data centers outside the continental US.
Thats more than a time-traveling DeLorean. Priorities, ppl!
I live alone in a small house in Michigan. My latest electric bill was 148 bucks. I have natural gas for heat. They have preemptively raised our rates to cover Open AI’s costs.
Should be if you want to build a large ass data center consuming that much electricity, you need to pony up to build or expand a power plant on your own dime. Fucking ridiculous, 1+ gigawatts of power is an insane amount of juice. Ran it through ChatGPT, depending on scenarios, 2.5-11million solar panels to cover that power across many tens of square miles
Great Scott!
OpenAI: [https://www.youtube.com/watch?v=nm6DO_7px1I](https://www.youtube.com/watch?v=nm6DO_7px1I)
Gretchie-poo no longer has my support. Backed her through a lot but she has fucked us for the last time.
Michigan needs to vote out these crap politicians.
The billionaire class is convinced that AI can preserve their consciousness until they perfect transferring said consciousness into a “donor” vessel.
It’s quite scary that we can see the crossroads behind us of trying to correct Climate change issues for future generations, and instead we’re now going down the path of letting every billionaire pillage US water supply and sack the public with increase in energy costs for their AI data centers.
local electric bills will go up.